Lost Dog Found |
Steve's old music page |
Taking Shape
|
previous
next | ![]() |
Email Us
This was the fourth trip for me up to Cromberg to work on the family cabin. The first time we cut down 50 trees and created something like 15 cord of wood stacked around the lot. The second time we formed and poured the foundation in 3 days. Previous to this trip, it was setting joists. This time the house would have a shape by the time we were through.
Unfortunately a fajita burrito from Rubio's gave me the worst stomach cramps of my life for 3 days, and I was pretty lame for the first two working days. They still managed without my being 100%... seeing as my father has done this before.